2015年6月30日星期二

Air way forklift hydraulic system to exclude:

1) the exclusion of lift star air forklift hydraulic system will recommend the use of hydraulic oil is injected to the provisions of the oil level gauge, oiling should mention the lifting cylinder.
2) the exclusion of air forklift hydraulic system, the truck's load reaches the rated load of 1 / 10-1 / 8, loosen the vent plugs from the lift cylinder on the forklift and then rose, falling several times until bleed plug at the absence of bubbles, and then tighten the bleed plug.
3) the exclusion of scissor lift table hydraulic system will tilt cylinder forward, back to the door frame to maximize the number of times two, to eliminate the tilt cylinder air.

2015年6月25日星期四

Forklift "low-quality products excess capacity, high quality products scarcity" phase coexistence

hand pallet trucks industry overcapacity is coveted machine manufacturers in this rapidly growing market, is a steady stream of investment, construction forklift machine manufacturing plant, in the process to capture more market share through price wars, continued shorten the product development cycle, not even the development of new products, homogeneous development of the whole enterprise, the number of Chinese lift star forklift market expansion led for much greater than demand, homogeneous product prices will continue to decline; on the other hand, China's economic development phase has undergone profound changes, but the industry has failed to follow the development model changes, there is part of the truck companies do not take the initiative, many colleagues from the production of products can be converted for the production of high-tech, high value-added equipment to product technology high-end, personalized product demand, market competition, international product direction, in order to get their own unique core competitiveness. So in the last five years, "low-quality goods and overcapacity, the scarcity of high quality products," the phenomenon of the truck is still there.

2015年6月19日星期五

Electric forklift repair techniques FAQ

1. The main fibrillation occurs when the lifting of the reasons are: lifting cylinder there is air in the hydraulic system leak, the inner door frame \ fork frame size wheel and bearing excessive wear, two lift chains elastic uneven.
2. When there is a load free falling fast main reasons: B leaking pipes and fittings have multiple valves of the valve hole \ sliding stem or seals wear, resulting in the leakage, supporting the Electric lifters cylinder piston ring / Y-ring wear , internal leakage
3. Lifting speed too slow or not the main reason for Air scissor lift the fuel tank oil, oil filter clogging, hydraulic oil temperature, hydraulic oil is too thin, leaking hydraulic lines, multi-way valve to adjust the pressure of improper
4. Zhidongshiling main reasons are: brake circuit open circuit, traction control brake friction plate electrode excessive wear, brake loose or brake pads gap is too large.
5. The main electrical part of the causes of sudden no fault forward and backward \ upgrade without any reflection, forklift dampen walking, forward speed can not be adjusted, and so on.

2015年6月2日星期二

The person is responsible for the electric pressure of the jack.


Site for people Jiang Gong told reporters, after all, the church has had a more than six years, experience near the tunnel construction, weather, rugged construction is decreased, the relocation back in the same place,  Self Propelled Pallet Truck to reinforce the protection construction of the church board more than the previous more than doubled.
The church moved slowly on track bearing.

Reporters saw "packaged" below the church has a thick layer of fixed concrete support. This seems to a tray church firmly placed is 9 track at the top, the lower bracket convenient,  Air lift table about half a metre wide track, up to 1 meter. In orbit above each about half a meter was placed a piece of wrist thick solid iron. Painted with lubricating oil, like a root bearing, the church is to be holding bracket, then the bearing track sliding forward.

According to the Jiang Gong. 6 years church before moving to the nearby, the bracket and the track was already pouring completed the, this just use the original most of the foundation,  Hand lifter is a newly built into the site of part of the orbital, because before tunnel construction has been removed from a short.
Reporters learned that the first translation went out to spend about about 3000000 yuan, the shift back because of the use of some of the original facilities, the cost savings of half.

450 tons thrust a move 15 cm
How does the church drive it and keep a church that has a century of churches not destroyed? Reporters yesterday scene also saw an interesting scene.
In the south side of the church,  electric lift table the nine track has nine jack, beside every jack has 2 to 3, 000 workers in charge of the scene, at the top of each rail also sat a worker, dedicated to the electric jack lost pressure. In front of them, there is a total command, holding a trumpet shouting three, one or two, and then hand press the electric switch, 9 Jack together with force, move the house forward. Reporters to the naked eye is difficult to find the house in mobile,  electric stacker but can see the ground on a rope in slowly straightened, moving house will be some small debris falling sound.