electric stacker Residential entrance room floor should be higher than the outdoor terrace of not less than 0.1m.


the construction site should have a variety of lifting equipment lifting platform technical notes , played certificate, safety rules , operating biographical books.
2 , lifting machinery installation after installation and acceptance by the relevant departments to participate in the installation of the unit , and to the use of units ( personnel) in order to use the safety technical tests . Should be approved subject to mechanical electric pallet trucks power sector Where mechanical team to innovate .
3 , lifting equipment should have a variety of security, two insurers , four full limit must be sensitive and reliable not to overload the signal commanding officers must be trained certification examination , allowed undocumented command posts .
4 , we must establish someone hydraulic stacker  plane, is relatively fixed, and to develop a post responsibility system or commander responsible for the system , shift system, regular maintenance system .
5, the machine operator to conduct specialized training , assessment certificate issued to the safe operation of the lift platform after passing a separate operation before induction .
6 , various types of machinery must strictly abide by the rules , Do not drink and operate, earnestly implement the three no's : that allowed maintenance during operation , the device sick are not allowed to run , are not allowed to overload . Should be strictly checked before work is solid and reliable protection devices and machinery is functioning well, the operation can be carried out after passing the examination .