(4) Test suspension



The bridge crane Scissor lift  ff the ground 0. 3-0. 5m, after 10min after no abnormality, further shaking bridge crane testing, inspection winches, masts, ropes and anchor cable winds of reliability, all normal , continue lifting.

(5) install the operating room

The bridge crane lifting off the ground about 2.5m high, setting up the sleepers under the crane heap, so that the crane resting on the sleepers on the heap, and then installed in the operating room on the frame. Zhuangwan cab car after adjusting the position, this position was calculated to determine the mast lifting points on both sides to reach equilibrium.

Then leave the sleeper crane helicopter heap a small distance, carefully adjusting the position of the car, make sure to balance again after fixing the car. Check other lifting facilities, safe and reliable confirmation only after the lifting style lifting.