2013年9月24日星期二

To ensure the accuracy of the roof moves

Retractable roof comprises a total of nine base plate is divided into two parts: one is 4 , and the other part of the 5 . On either side of each plate are fixed with angled steel . There are 10 frames across 77 meters of the stadium . Each steel wheels supported by a set of ports can be installed in the center court along both sides of the Shop Lifter move . Ready to close the retractable roof , the northernmost part of the stadium to keep the folded state , parked in another part of the southern end . To ensure the accuracy of the roof moves , you need to install a high-precision electronic actuators, servo motor and rocker synthesis system . This system will separate the steel , while steel between the upper and the steel parts of substantially begin until the two parts of the top center of the pitch joints combined stacked flat . Steel is installed on the bottom of the hinge a number of similar components. Schaeffler FAG spherical roller bearings assembled in these hinge . These bearings due to friction is small, and can be carried out right kind of compensation is selected. These bearings are grease lubricated through high-performance , during use, requires minimal maintenance

没有评论:

发表评论