Electric Stacker is the battery power as an energy source, a motor as a power source storage device. The main structures include: batteries, motors, hydraulic pumps, cylinders, piston rods, forks, chains, controller, etc. devices. Its main function is to enhance the weight to the desired height.
2013年9月4日星期三
Wheeled crane repairs
This article explains wheeled crane repair work, from understanding the phenomenon, determine the cause talk, to determine a repair solution has been
(A) failure to understand the phenomenon Crane parts during operation partner suddenly suddenly invaded or mountain now crawling, vibration, abnormal temperature rise and smoke, smell, sound, meter pointer jump swing, oil spills, leaks, leaking, leakage, control failure, etc., called Zhao fan malfunction.
When the crane when a fault occurs, some phenomena can clearly be observed, and some hidden imperceptible. Manual stacker and inspection must be carefully observed in order to find the real source of it down. (Two) analyze the cause Yi Gu array of phenomena as the basis, in accordance with the rules and guns corporate failure by practical experience, control apricot find relevant information, list of similar phenomena whose failure may occur for various reasons, sub-Xin structure and [: operating principles, discussed to determine the real cause of the malfunction.
(Three) to determine demolition site
Failure Analysis is based to determine what caused the failure of the parts, and the powered palle ttruck of the system to determine the demolition inspection of the site.
(Four) demolition inspection
For determining the dismantling of the site, shall give rise to the ibility of failure, to determine the sequence of disassembly
Unloading operations, except in compliance with - 'suits mechanical disassembly required outside, but also pay attention to the following questions:
1. Preparation for traveling to run dry stable frame bracket pad Zhao, 2. Standby system at ten non-working state
Yi closed engine, release the hydraulic system and pneumatic system 44 residual Osteoform. In order to avoid injury.
3. Reasonable profit and loading one hundred rejection Tools
Clarify the demolition pits pieces or parts of the quality of the parts for the soft heavy lifting equipment should use reliable auxiliary operations. Reduce labor intensity is also conducive to human, machine safety. Cong on the need to use special removable parts and components, use the specified tools for repairs. Assembly demanding and difficult technical conditions disintegration devices shall