2013年9月4日星期三

) to have regular safety technical inspection , good pre- preparatory work


Bridge crane all electrical equipment enclosure should be grounded. If the car is not welded to the main beam track Hand pallet jacks be taken when welding ground measures . Ground wire cross-sectional area greater than 75mm2 available galvanized flat iron or bare copper or greater than 10mm2 30mm2 galvanized round . Cab or crane body ground position should be more than two . Any point on the crane to the power between the neutral point grounding resistance scissor pallet truck be less than 4Ω.
to have regular safety technical inspection , good pre- preparatory work .
Troubleshooting Maintenance
Leak repair protection
Bridge crane trolley gear due to vibration, abrasion , pressure, temperature and other factors, the combination of surface sealing parts often appear static leakage . Traditional treatment methods to remove reducer, replacing gaskets or sealant applied , but time-consuming and difficult to ensure the sealing effect , will appear again in the operation of leakage. Contemporary Western countries use more polymer composites leakage field of governance , the most widely Blessed World Blue series. Polymer -free disassembly repair and materials have excellent adhesion, oil resistance and 350% elongation , good to overcome the impact of vibration reducer , repair effect is more effective than traditional methods .

没有评论:

发表评论